Two planted roof terraces seen from below against a bright blue sky
Studio

Independentsince2008,andstillansweringourownphones

One office in London became five, and the drawing board never left the business. Four partners, twenty-two people, and a rule that whoever sells you the work is in the room when it is delivered.

18Years in practice
5Offices
22People
What we believe

Threeruleswehavenotbrokenyet

Every studio has values on a wall. These three are the ones clients can actually hold us to, because each has something measurable behind it.

We say the number early

A realistic cost in week two is worth more than an optimistic one in month six. If a scheme does not work, you hear it while it is still cheap to change.

We stay past handover

Every completed building is measured for a full year: energy, comfort, acoustics. The results go into the next design whether they flatter us or not.

We keep the drawing board

The studio never became a pure agency. Someone in the room can always draw the thing being argued about, which shortens most arguments considerably.

The people

Smallteam,longrelationships

Founding partner

Amina Belhaj

Acquisitions and negotiation

Started the firm in 2008 after a decade valuing commercial stock. Sits in on every offer above a million and still writes the difficult emails herself.

  • English
  • French
  • Arabic
Head of acquisitions

Jonas Vik

Off-market sourcing, Nordics

Knows which Oslo and Copenhagen buildings will come up before the agents do, because he has been calling the same owners for eleven years.

  • Norwegian
  • English
  • Danish
Design director

Clara Mendes

Architecture and refurbishment

Runs the studio side, from parametric massing to the last door handle. Will happily redraw a kitchen four times to save you a wasted metre.

  • Portuguese
  • English
  • Spanish
Delivery lead

Tomas Reiner

Site supervision and handover

On site more than in the office. Keeps the snag list short by catching things while they are still cheap to fix, and calls you the same day.

  • German
  • English
  • Danish
Slim columns holding up heavily planted terraces above a shaded walkway
Standards

WhateveryKondorubuildinghastoearn

These four are not upgrades or options. If a scheme cannot meet them on the site it has, we redesign the scheme rather than lower the standard.

Daylight first

Every apartment is modelled for at least four hours of direct winter light before a wall is drawn.

Low carbon fabric

Cross-laminated timber cores and recycled aggregate cut embodied carbon by up to 42 per cent.

Shared ground

Courtyards, workshops and roof gardens designed so neighbours actually meet each other.

Built to be kept

Twenty-five year fabric warranty, with a maintenance plan handed over on completion day.

How we work

Fourstages,andwhatyoucanwalkawaywithaftereach

Read this one from your side of the table. Every stage ends with something on your desk that belongs to you, and you can stop there and take it elsewhere. Most people do not. We would rather you could.

We listen, then argue a bit

A long conversation about the site, the money and the people who will live with the result. We will disagree with something you have already decided, and say why, and then write it all down.

Week one

We model far too many options

Parametric massing, daylight and airflow tested across hundreds of variations before anything is fixed. Most get thrown away. The three worth showing you arrive with the reasons attached.

Weeks two to four

We detail it with the makers

Joints, tolerances and materials resolved with the people who will actually build them, because the details that fail in year eight are always the ones drawn generically and improvised on site.

Weeks five to fourteen

We stay until the last snag

On site through construction, at handover with a maintenance plan written for whoever will actually use it, and back twelve months later with sensors to measure what we predicted.

On site, then a year

Nothing above is a retainer. Each stage is quoted before it starts and invoiced when it ends, so the most you are ever committed to is the one you are in.

Recognition

Twelveawards,andonewelostfairly

Useful mainly because the juries visit the buildings in use rather than looking at renders. Our 2023 civic entry lost to a better scheme, which we still think about.

2026RIBA regional shortlistAzure Pavilion
2025Nordic Timber PrizeKobalt Studios
2025BREEAM ExcellentKobalt Studios
2024Lisbon Heritage AwardIndigo Terrace
2024Civic Trust commendationBlue Hall
2023Low Carbon Fabric PrizeFacade Lab
Offices

Fivecities,onewayofworking

Come and see us

Thekettleisoninallfiveoffices

Drop in, or start with a call. Either way you will speak to one of the four partners before anything is signed.